1. Project Theme

Design object for construction of an “in situ” reinforced concrete building.

The building is formed by 3 corpses, each of them being a multistory identical structure. Over the basement each corpses has 2 stores. The building is provided for stacking of the manufactured assets. The design is focus on central corp.

1.1 Architectural Description

All corps of the building are of equal length and are separated through contraction/dilatation joints. In horizontal plane has 2 bays of length “L” and “m” spans of length “T” in meters. The building configuration is regular. The envelope of the building is made of brick masonry.

1.2 Structural System

The building is a 2 bay portal frames formed of columns and main beams fix connected. The columns are of section 500x500 mm to each cross point between longitudinal and transversal axes.

Repetitive concrete slabs bear on beams grid over each story. The portal frames are longitudinal braced by beams contained in floor plane. The beams are connected to columns and the connection is considered fix. The type of construction for all floors is beam-slab-floor. The arrangement of the grid beams is such conceived to result in one way spanning slab for the roof and the second floor, and a two way spanning slab for the first floor.

In longitudinal way the infill masonry from basement is supported of ground beams which bear on foundation. Pad foundations are provided for every column.

1.3 Material used to construction

In foundation: concrete of class C 12/15

In structural system: concrete of class C 16/20

As a steel we will use for longitudinal reinforcement PC52 for linear element and OB37 for main reinforcement to surface element.

1.4 Project pieces

The documentation of the project will include:

A. DESIGN NOTES

A1. Design object

A2. Arrangement an preliminary size of structural members

A3. Analysis and design of the slab of the second floor

A4. Analysis and design of the beam of the second floor

A5. Analysis and design of the grid of the second floor

A6. Analysis and design of the slab of the first floor

A7. Analysis and design of the grid of beams of the first floor

B. DRAWN PLANS

R01. Formwork and reinforcing detailing plane-second floor plane

R02. Formwork details and reinforcing detailing plane-second floor beam

R03. Formwork details and reinforcing detailing plane-second floor

R04. Formwork details and reinforcing detailing plane-first floor slab, wired mesh

R05. Formwork details and reinforcing detailing plane-first floor slab, mesh fabric reinforced

R06. Formwork details and reinforcing detailing plane-first floor grid beams

1.5 Personal Data

n= 33 – individual number;

L=7.0m+0.1*n→ L= 7.0+0.1*33=9.3m;

T=5.50+0.05*n→T= 5.50+0.05*33=6.65m;

Pk=750±10*n [daN/m2]=750-10*33=520[daN/m2] – service load;

C16/20 - fcd=12.5[N/mm2]

OB37 – fyd=210 [N/mm2]

PC52 – fyd=300 [N/mm2]

PC60- fyd=350 [N/mm2]

m= 4 spans for odd numbers; (*)

5 spans for even numbers ;

Preview document

Civil Engineering and Building Services - Pagina 1
Civil Engineering and Building Services - Pagina 2
Civil Engineering and Building Services - Pagina 3
Civil Engineering and Building Services - Pagina 4
Civil Engineering and Building Services - Pagina 5
Civil Engineering and Building Services - Pagina 6
Civil Engineering and Building Services - Pagina 7
Civil Engineering and Building Services - Pagina 8
Civil Engineering and Building Services - Pagina 9
Civil Engineering and Building Services - Pagina 10
Civil Engineering and Building Services - Pagina 11
Civil Engineering and Building Services - Pagina 12
Civil Engineering and Building Services - Pagina 13
Civil Engineering and Building Services - Pagina 14
Civil Engineering and Building Services - Pagina 15
Civil Engineering and Building Services - Pagina 16
Civil Engineering and Building Services - Pagina 17
Civil Engineering and Building Services - Pagina 18
Civil Engineering and Building Services - Pagina 19
Civil Engineering and Building Services - Pagina 20
Civil Engineering and Building Services - Pagina 21
Civil Engineering and Building Services - Pagina 22
Civil Engineering and Building Services - Pagina 23
Civil Engineering and Building Services - Pagina 24
Civil Engineering and Building Services - Pagina 25
Civil Engineering and Building Services - Pagina 26
Civil Engineering and Building Services - Pagina 27
Civil Engineering and Building Services - Pagina 28
Civil Engineering and Building Services - Pagina 29
Civil Engineering and Building Services - Pagina 30
Civil Engineering and Building Services - Pagina 31
Civil Engineering and Building Services - Pagina 32
Civil Engineering and Building Services - Pagina 33
Civil Engineering and Building Services - Pagina 34
Civil Engineering and Building Services - Pagina 35
Civil Engineering and Building Services - Pagina 36
Civil Engineering and Building Services - Pagina 37
Civil Engineering and Building Services - Pagina 38
Civil Engineering and Building Services - Pagina 39
Civil Engineering and Building Services - Pagina 40
Civil Engineering and Building Services - Pagina 41
Civil Engineering and Building Services - Pagina 42
Civil Engineering and Building Services - Pagina 43
Civil Engineering and Building Services - Pagina 44
Civil Engineering and Building Services - Pagina 45
Civil Engineering and Building Services - Pagina 46

Conținut arhivă zip

  • Civil Engineering and Building Services
    • 1.dwg
    • 123.docx
    • 2.dwg

Alții au mai descărcat și

Izolații

Romania dispune de o impresionanta substanta istorica , care documenteaza cronologic schimbarile tarii si impreuna cu acestea, istoria diferitelor...

Caiet practică tencuieli, finisaje

Caiet de practică Executarea lucrărilor de tencuială , zugrăveală şi vopsitorii Tencuiala este stratul de finisaj aplicat pe suprafaţa brută a...

Calcul Cofraje

Număr de ordine: 37 1. Date iniţiale : - grosime placă : hpl= 16 cm - înălţime nivel : Hnivel = 2.80 m - dimensiuni în plan a plăcii : 3.95 x...

AutoCad 2002

Bara de meniuri. Bara de meniuri derulante se afla sub bara de titlu, care va ofera accesul la meniurile derulante. Pentru a afisa un astfel din...

Construcții

1.3 Coordonarea modulară şi toleranţele Coordonarea dimensională în construcţii reprezintă metoda de stabilire a dimensiunilor şi poziţiilor...

Tehnici de Modelare Fizică

1. OBIECTUL TEMEI Obiectul temei reprezintă modelarea fizică a fenomenului de convecţie forţată în interiorul conductelor circulare. Se va modela...

Te-ar putea interesa și

Reinforced Concrete - Floor Design (Beton Armat)

CHAPTER I BEAM AND GIRDER FLOOR 1.1. Data and specifications A concrete floor slab type beam and girder is considered as a part of a building...

Civil Buildings

Design calculation for a 2-Storey Dwelling made by Masonry Cross Walls According to EC6 Introduction The structure is a rigid one made by masonry...

Thermal Assessment and Upgrading of 2-Storey Dwelling made by Masonry Cross Walls

Techincal Report Individual Dwelling The individual dwelling in design consists of a 2 storied house plus a basement. It has a 2 slopepitched...

Topografie

Theoretical Support The ensemble of operations in order to obtain plans and maps is known as surveying. Because during land surveying, the...

Land Surveying - Solved Assignments

Application theme In order to make a corect reprezentation in plan of a topografic surface there are necesary some basic topografic calculus...

Tehnici operațional bancare - case study - SC Arcul de Triumf Târgoviște SRL

1. Description of the loan S.C Arcul de Triumf Targoviste S.R.L applied for an investment credit of 200,000 RON over a period of 3 years for two...

Concrete Project - All Laboratories Including Calculus

Strength of concrete in compression Main reasons : • Quality control • Design of structural memebers Both of them are based on characteristic...

Ventilații

CAPITOLUL 1 INTRODUCERE 1.1GENERALITĂŢI Calitatea mediului în care oamenii îşi desfăşoară activitatea are o influenţă complexă asupra lor, atât...